NRC Logo

Home > NRC Library > ADAMS Public Documents

Response to ASLB 841109 memorandum re pipe supports.None of hot functional testing results described by RE Camp corroborates CASE allegations or raises any safety question re pipe support design.

Accession Number: ML20100B282

Date Released: Thursday, April 23, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer