Notification of contract execution,mod 5 to Task Order 11, "ADP Planning,Requirements Analyses & Preliminary Design Studies." Contractor:Applied Mgt Sys,Inc.
Accession Number: ML20097E680
Date Released: Sunday, October 27, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20097E676 - Notification of contract execution,mod 5 to Task Order 11, "ADP Planning,Requirements Analyses & Preliminary Design Studies." Contractor:Applied Mgt Sys,Inc. (1 page(s), 6/4/1992)
- ML20097F301 - Ltr contract NRC-33-89-132,mod 5,increasing level of effort to Task Order 11, "ADP Planning,Requirements Analyses & Preliminary Design Studies." (2 page(s), 6/4/1992)