NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Vogtle Electric Generating Plant Unit 2,Cycle 3 Core Operating Limits Rept." Revised rept becomes effective upon entry into Mode 5 following completion of fuel loading.

Accession Number: ML20095H309

Date Released: Saturday, April 18, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer