NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 1 to "Analysis of Unrepaired Flow Indications at Brunswick Steam Electric Plant,Unit 2." Welds acceptable per criteria in Generic Ltr 84-11.Performance capability of Level 1,2 or 3 demonstrated per IE Bulletin 83-02.

Accession Number: ML20094N223

Date Released: Friday, April 17, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer