Home > NRC Library > ADAMS Public Documents
First partial response to FOIA request for documents. Forwards App A records already available in PDR & App B & C records being made available in PDR.
Accession Number: ML20093D343
Date Released: Friday, November 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20094C120 - Forwards draft SALP input for review.Comments received by 880202 will be considered in final rept.Tabulation of SALP input from technical staff also encl.Applicant evaluated to be Category 2 during SALP period for CY87.W/o input. (31 page(s), 1/28/1988)
- ML20094C361 - Forwards Project Directorate IV input to SALP rept for Jan 1989 to Jan 1990.Licensee handled 891128 failure of emergency diesel generator 22,which delayed restart by 6 wks,in well-organized & structured manner. (21 page(s), 2/22/1990)
- ML20093D604 - "South Texas Project Pre-SALP Board MIP Close Out Interim MIP," presented at 910602-920801 SALP meeting. (156 page(s), 7/21/1992)
- ML20093D570 - "Region IV Div of Reactor Projects Plant Performance Midcycle Review for South Texas Project,SALP Cycle 009." (8 page(s), 4/23/1992)
- ML20094C244 - Forwards NRR SALP input for Jan-Dec 1988,for SALP Board meeting currently scheduled for 890210. (10 page(s), 2/9/1989)
- ML20094C340 - Provides SALP input for Jan 1989 - Jan 1990.Offers no reportable licensing activities re plant for rating period. (3 page(s), 1/4/1990)
- ML20097H847 - Concurs w/proposed schedule to adjust current SALP end date until 6 to 9 months after unit startup,per 930630 memo. (8 page(s), 7/22/1993)
- ML20093D715 - "Region IV Div of Reactor Projects Quarterly Plant Performance Review," for SALP period 920802-940702. (168 page(s), 10/19/1993)
- ML20093D510 - "Region IV Div of Reactor Projects Pre-SALP Board for South Texas Project," presented at 900201-910531 SALP meeting. (58 page(s), 2/1/1990)
- ML20093D718 - "Region IV Div of Reactor Projects Quarterly Plant Performance Review," for SALP period 920802-940702. (211 page(s), 1/19/1993)
- ML20097H763 - Forwards SALP input based on results of service water sys operational performance insp on 920622-0710. (7 page(s), 10/13/1992)
- ML20094D074 - Forwards NRR SALP input rept for functional area of safety assessment/quality verification for Feb 90 - May 1991. (9 page(s), 7/16/1991)