NRC Logo

Home > NRC Library > ADAMS Public Documents

Submits info re Pond 3.Flow rate at French drain was 8.75 gpm on 840306 & 11.5 gpm on 840403.During Feb & Mar,135,400 lbs hydrate lime added to Pond 3.No significant change at three monitor wells near Pond 3 noted.

Accession Number: ML20092N938

Date Released: Saturday, October 26, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer