Home > NRC Library > ADAMS Public Documents
TS Change Request 95-01-0 to licenses NPF-39 & NPF-85, revising TS Table 4.3.1.1-1, "RPS Instrumentation SRs" to reflect change in calibr frequency for LPRM signal from every 1,000 EFPH to every 2,000 megawatt days per std ton.
Accession Number: ML20092J395
Date Released: Wednesday, April 15, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20092J394 - TS Change Request 95-01-0 to licenses NPF-39 & NPF-85, revising TS Table 4.3.1.1-1, "RPS Instrumentation SRs" to reflect change in calibr frequency for LPRM signal from every 1,000 EFPH to every 2,000 megawatt days per std ton. (9 page(s), 9/18/1995)
- ML20092J396 - Proposed TS Table 4.3.1.1-1, "RPS Instrumentation SRs" & TS Bases 3/4.3.1,changing calibr frequency for LPRM signal from every 1,000 EFPH to every 2,000 megawatt days per std ton. (5 page(s), 9/18/1995)