NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards insp rept 50-271/91-21 on 910806-09.Two activities re svc water discharge valve lineup & replacement of switchyard battery 4A determined to be violations of 10CFR50.59 requirements.

Accession Number: ML20091G160

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer