NRC Logo

Home > NRC Library > ADAMS Public Documents

Informs that on basis of problems associated w/TDI diesel engines,onsite electrical supply sys do not meet GDC 17. Prior to supporting operation above 5% full power,TDI issue must be addressed.

Accession Number: ML20091F751

Date Released: Friday, November 6, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer