NRC Logo

Home > NRC Library > ADAMS Public Documents

LER 76-001/03L:on 760130,channel 2 overtemp delta-T reactor trip setpoint exceeded Tech Spec limit by one degree.Caused by failure of two filter capacitors in signal summator. Capacitors replaced.W/760225 ltr.

Accession Number: ML20090E626

Date Released: Monday, April 13, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer