Home > NRC Library > ADAMS Public Documents
Addl response to FOIA request re 821012-1125 & 830119-21 special investigations of facilities.Forwards matl listed in Apps A-K.Info in App F partially deleted (ref Exemption 7).W/14 oversize drawings.Aperture cards in PDR.
Accession Number: ML20082S125
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20082S124 - Addl response to FOIA request re 821012-1125 & 830119-21 special investigations of facilities.Forwards matl listed in Apps A-K.Info in App F partially deleted (ref Exemption 7).W/14 oversize drawings.Aperture cards in PDR. (27 page(s), 7/28/1983)
- ML20082S352 - Forwards monthly status rept for Feb 1983.W/o encl. (1 page(s), 3/14/1983)
- ML20263C122 - "Concrete Outlines Plan At Elevation 664'-6'". Sheet 2. Related info encl. (1 page(s), 1/13/1981)
- ML20082S337 - Forwards "Independent Assessment of Auxiliary Bldg Underpinning,Weekly Rept 5 for 821017-23." Related info encl. (3 page(s), 10/27/1982)
- ML20082S232 - Rev 0 to Procedure PEP 4.46.9 "Project Engineering Review of Field Markup Working Prints (Redlines) for Midland Project 7220." Related info encl. (250 page(s), 10/4/1982)
- ML20082S133 - Forwards document entitled "Armor Stone Placement" & related info. (18 page(s), 9/22/1982)
- ML20263C127 - "Saddle Support Detail." Sheet 2 of 2. (1 page(s), 2/24/1982)
- ML20082S260 - Rev 1 to "NRC Open Items List." Related info encl. (21 page(s), 11/10/1982)
- ML20082S626 - Forwards monthly status repts from 820801-1031 & Nov 1982. Repts enable NRC to keep track of important chronological events & provide mechanism for keeping IE & NRR informed of events. (1 page(s), 12/4/1982)
- ML20082S167 - Requests assistance w/reviewing remedial soils work & periodic licensee requests for relief from SSER commitments. Periodic site visits recommended. (1 page(s), 3/16/1983)
- ML20082S218 - Forwards draft IE insp rept,notice of violation & proposed imposition of civil penalties.IE taxing notice of violation & ltr to applicant encl. (17 page(s), 2/4/1983)
- ML20082S299 - "Midland Monthly Status Rept from Aug-Sept 1982." (9 page(s), 12/20/1982)
- ML20082S256 - Draft Rev 0 to "NRC Open Items List." (5 page(s), 11/12/1982)
- ML20082S425 - Voided Rev 1 to FPG-5 "Procedure For Control of Stock Structural Steel." (5 page(s), 5/18/1976)
- ML20082S290 - Rev 1 to "Tech Spec for Code Effective Dates for Const of Nuclear Piping Sys,Including Piping Supports for CPC Midland Plant Units 1 & 2." Related info encl. (35 page(s), 2/4/1981)
- ML20082S237 - Excerpt from 830208 news release discussing assessed penalties against util.Assessment levied as civil penalty for violations re defective diesel generator bldg equipment identified during Oct & Nov 1982 insps.Related info encl. (27 page(s), 2/8/1983)
- ML20082S279 - Rev 6 to Procedure FPE-4.000 "Installation & Rework of Electrical Cables." (11 page(s), 11/17/1982)
- ML20082S414 - Voided Rev 0 to FPG-5 "Procedure for Control of Stock Structural Steel." (6 page(s), 8/19/1974)
- ML20082S184 - Forwards monthly status rept for Dec 1982. (4 page(s), 1/11/1983)
- ML20263C120 - "Cable Tray Seismic Supports Diesel Generator Bldg Plan of Elevation 634'-6"." Sheet 1 of 2. (1 page(s), 8/23/1982)
- ML20082S179 - Notifies of 821207 mgt meeting w/Region III re implementation of QA & IDVP.Agenda items listed. (1 page(s), 11/24/1982)
- ML20082S355 - Forwards monthly status rept for Feb 1983. (2 page(s), 3/3/1983)
- ML20263C125 - "Control Panel Cutout & Component Replacement." Sheet 4 of 5.Related info encl. (1 page(s), 8/23/1982)
- ML20082S323 - Forwards "Independent Assessment of Auxiliary Bldg Underpinning,Weekly Rept 3 for 821003-09". (3 page(s), 10/13/1982)
- ML20082S151 - "QC Insp Record for Field Fabrication of Miscellaneous Steel." Related info encl. (50 page(s), 7/12/1982)
- ML20082S192 - Press Release 83-07,discussing scheduled listed evidentiary hearing dates re issues in OL/soils settlement proceedings. Hearings scheduled in Midland,MI. (1 page(s), 2/8/1983)
- ML20082S140 - Rev 0 to 7220-C-209 "Tech Spec for Subcontract for Furnishing & Installing Armor Stone Overlay on Cooling Pond Dike for CPC Midland Plant Units 1 & 2." Related info encl. (26 page(s), 5/2/1981)
- ML20082S242 - Forwards Safety Concern & Reportability Evaluation 10 assigned for coordinating further evaluation required to make final reportability evaluation on diesel generator exhaust sys hangers.Related info encl. (5 page(s), 12/20/1982)
- ML20082S161 - Rev 1 to FPD-5.000 "Preparation of Field Sketches." Related info encl. (20 page(s), 1/27/1982)
- ML20263C116 - Rev 9 to "Project Civil Stds Structural Steel Details & General Notes." Related info encl. (4 page(s), 8/31/1982)
- ML20082S148 - Rev 7 to Procedure AAPD/PSP G-3.2 "Control of Nonconforming Items," field insp manual. (72 page(s), 6/1/1981)
- ML20263C118 - "Outlines & Sections Diesel Generator Local Panel." (1 page(s), 11/18/1980)
- ML20082S137 - Forwards draft info for 830118 enforcement conference.Names of people from recipient staff attending conference requested.Related info encl.Oversized organization chart encl. (150 page(s), 1/7/1983)
- ML20082S372 - Agenda for meeting w/util to discuss noncompliance noted during 821012-1125 insps of diesel generator bldg. (11 page(s), 7/28/1983)
- ML20082S387 - Forwards draft proposed facility escalated enforcement package.Enforcement conference to be held on 830118.Related info encl. (100 page(s), 1/6/1983)
- ML20082S200 - Marked-up "Problems Identified During Oct-Nov 1982 Midland Const Insp." Related info encl. (100 page(s), 12/7/1982)
- ML20082S214 - Forwards draft monthly status rept of activities completed through const phase.Communications section to be completed. Related info encl. (100 page(s), 12/10/1982)
- ML20082S314 - Forwards "Independent Assessment of Auxiliary Bldg Underpinning,Weekly Rept 2 for 820927-1003". (3 page(s), 10/12/1982)
- ML20263C123 - "Cable Tray Seismic Supports Diesel Generator Bldg Plan of Elevation 634'-6"." Sheet 2 of 2. (1 page(s), 8/29/1982)
- ML20082S154 - Notification of 830208 meeting w/util in Midland,MI to discuss integrated const completion program & third party assessment effort. (2 page(s), 1/11/1983)
- ML20263C114 - Rev 12 to "Cooling Pond Plan." Sheet 3. (1 page(s), 6/16/1981)
- ML20082S327 - Forwards "Independent Assessment of Auxiliary Bldg Underpinning,Weekly Rept 4 for 821010-16." Related info encl. (4 page(s), 10/18/1982)
- ML20082S157 - Rev 0 to Procedure B-3M "Midland Project QA Dept Procedure." (1 page(s), 10/25/1982)
- ML20082S398 - Util response to NRC concerns re Items C-19 concerning connections of HVAC fan support bolted instead of welded & C-14 concerning incorrect measurements on Drawing C-1004. Related info encl. (32 page(s), 11/12/1982)
- ML20263C112 - "Emergency Pond Intake Trench & Discharge Lines." (1 page(s), 9/14/1978)
- ML20082S229 - Comments on 821213-15 meetings w/Region III to discuss facility insp.Info deleted. (10 page(s), 1/3/1983)
- ML20082S143 - Rev 3 to Procedure M-2 "Trend Analysis,Phase III." (6 page(s), 4/23/1982)
- ML20082S175 - List of app items & IE rept & section.Related info encl. (47 page(s), 7/28/1983)
- ML20082S246 - Rev 9 to FPG-4.000 "Storage - Maint/Insp of Equipment & Matls." Related info encl. (28 page(s), 7/12/1982)
- ML20082S331 - Info required to answer NRC question re diesel generator silencer matl traceability.Related info encl. (15 page(s), 7/28/1983)
- ML20263C110 - "Diesel Generator Exhaust & Miscellaneous Piping." Sheet 1. (1 page(s), 8/24/1982)
- ML20082S163 - Rev 0 to Procedure B-3M-1 "Qualification & Certification of Insp & Test Personnel." (21 page(s), 10/25/1983)
- ML20263C109 - "Diesel Generator Exhaust & Miscellaneous Piping." Sheet 1. (1 page(s), 9/16/1982)
- ML20082S396 - Requests clarification of NRC position on FSAR,App 3A exception to Reg Guide 1.29,Position C.4.Licensee position was that exhaust piping nonsafety-related component of emergency sys. (7 page(s), 10/29/1982)
- ML20082S306 - Forwards "Independent Assessment of Auxiliary Bldg Underpinning,Weekly Rept 1 for 820919-26." (3 page(s), 9/29/1982)
- ML20082S273 - Rev 3 to Procedure FPW-4.000, "Process Control Operations for ASME & Q Piping Sys." Related info encl. (19 page(s), 10/13/1981)
- ML20082S146 - "Presentation on Const Project Evaluation on CPC Midland Energy Ctr Project Units 1 & 2." Related info encl. (25 page(s), 3/15/1983)
- ML20082S409 - Informs that max of 2 days will be allowed for field engineers review of rev to design document.Number of outstanding attachments will be reduced.Related info encl. (30 page(s), 11/12/1981)
- ML20082S263 - Rev 2 to "NRC Open Items List." Related info encl. (40 page(s), 11/22/1982)
- ML20082S190 - Info re installation & rework of electrical cable trays. (20 page(s), 11/18/1982)
- ML20263C138 - "Foundation Drawing-Miscellaneous." Related info encl. (1 page(s), 12/8/1977)
- ML20082S130 - Forwards memo to WJ Friedrich establishing policy that IPINS will not be used to document nonconformances found in future insps.Exploration of revised process to replace procedure in progress.Related info encl. (27 page(s), 1/26/1983)
- ML20082S187 - Notification of 830118 enforcement conference w/util in Glen Ellyn,IL to discuss results of special team insp of diesel generator bldg.Agenda & related info encl. (28 page(s), 1/4/1983)