Home > NRC Library > ADAMS Public Documents
Forwards updated LER 83-077/03X-1 & LERs 83-096/03L-0 & 83-097/03L-0.
Accession Number: ML20081A949
Date Released: Saturday, April 4, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20081A947 - Forwards updated LER 83-077/03X-1 & LERs 83-096/03L-0 & 83-097/03L-0. (1 page(s), 10/18/1983)
- ML20081A971 - Updated LER 83-077/03X-1:on 830810,two nonessential svc water valves missing from containment integrity procedure & one cap needed.Instrument isolations identified on air lock.Caused by personnel error. (2 page(s), 10/18/1983)
- ML20081A996 - LER 83-096/03L-0:on 830924,during refueling outage,Fire Door 517 would not latch properly between contractor access control & auxiliary bldg.Caused by loose active leaf latching mechanism.Mechanism tightened. (1 page(s), 10/18/1983)
- ML20081B077 - LER 83-097/03L-0:on 830921,during refueling outage,Fire Door 373 would not latch properly to 591 elevation vestibule area.Caused by sticky latch mechanism.Mechanism adjusted,lubricated,tested & returned to svc. (1 page(s), 10/18/1983)