Home > NRC Library > ADAMS Public Documents
Forwards procedures generation package,in response to Generic Ltr 82-33,Suppl 1 to NUREG-0737, "Requirements for Emergency Response Capability." Procedures include plant-specific technical guidelines.
Accession Number: ML20080E215
Date Released: Saturday, October 26, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20080E212 - Forwards procedures generation package,in response to Generic Ltr 82-33,Suppl 1 to NUREG-0737, "Requirements for Emergency Response Capability." Procedures include plant-specific technical guidelines. (3 page(s), 1/31/1984)
- ML20080E222 - Procedure 32-1106885-00, "Abnormal Transient Operating Guidelines:Arkansas Nuclear One Unit 1 - Rancho Seco Sys Comparison." (27 page(s), 7/16/1981)
- ML20080E229 - Rev 1 to Procedure AP.47, "Emergency Operating Procedures Writers Guide." (17 page(s), 9/16/1983)
- ML20080E234 - "Verification & Validation Program Description for Rancho Seco Procedures Generation Package Submittal." (3 page(s), 1/31/1984)
- ML20080E240 - "Training Plan for Implementation of Emergency Operating Procedures." (2 page(s), 1/31/1984)
- ML20080E243 - "Transient Info Document for Loss of Offsite/Onsite Power at Rancho Seco." (167 page(s), 10/8/1981)
- ML20080E258 - Procedure 86-1127307-00, "Abnormal Transient Operating Guidelines:Excessive Main Feedwater Event Transient Info Document." (76 page(s), 9/3/1981)
- ML20080E266 - Procedure 86-1127426-00, "Abnormal Transient Operating Guidelines for Loss of Feedwater Transient Info Document." (29 page(s), 8/20/1981)
- ML20080E285 - "Transient Info Document for Small Steam Line Break Event." (30 page(s), 8/17/1981)
- ML20080E306 - Procedure 74-1127469-00,Vol 1, "Abnormal Transient Operating Guidelines,Part I:Procedural Guidelines." (124 page(s), 12/15/1982)
- ML20080E321 - Procedure 74-1127469-00,Vol 1, "Abnormal Transient Operating Guidelines,Part II:Fundamentals of Reactor Control for Abnormal Transients." (311 page(s), 10/8/1982)
- ML20080E327 - Procedure 74-1127469-00,Vol 2, "Abnormal Transient Operating Guidelines,Part II:Discussion of Selected Transients." W/seven oversize encl.Aperture cards are available in PDR. (252 page(s), 10/8/1982)