Responds to FOIA request for documents re facility hot functional testing problems,including broken thermowells, loose & broken reactor coolant pump parts & loose thermal sleeves.Forwards App A documents.Documents also in PDR.
Accession Number: ML20080C249
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20080C478 - Preliminary Rev 0 to "Main Steam Traps & Drain Valves Hot Functional Test," test results rept for 830606-15. (4 page(s), 9/7/1983)
- ML20080C467 - Preliminary Rev 0 to "MSIV & Bypass Valves Hot Functional Test," test results rept for 830602-0703. (18 page(s), 8/25/1983)
- ML20080C584 - Submits daily highlight re reactor coolant pump problems following Jul 1983 hot functional testing.Util to meet w/ vendor to discuss course of action. (2 page(s), 8/4/1983)
- ML20080C451 - Preliminary Rev 0 to "Pre-Core Chemical & Vol Control Sys Integrated Test," test results rept for 830604-0704. (5 page(s), 9/19/1983)
- ML20080C421 - Preliminary Rev 0 to "Pre-Core Safety Injection Check Valve Test," test results rept for 830602. (6 page(s), 9/14/1983)
- ML20080T053 - Provides update on status of efforts for resolving anomalies found during hot functional testing involving RCS pumps, thermal sleeves,thermowells,C-E shroud assemblies & metal filings on upper support structure. (2 page(s), 10/11/1983)
- ML20080C539 - Preliminary Rev 0 to "Pre-Core Emergency & Auxiliary Feedwater Sys Test," test results rept for 830503-0703. (15 page(s), 10/15/1983)
- ML20080C395 - Preliminary Rev 1 to "Steam Generator Blowdown Sys Test," test results rept for 830611-15. (3 page(s), 8/1/1983)
- ML20080C409 - Preliminary Rev 0 to "Atmospheric Dump Valve Hot Functional Test," test results rept for 830603-0822. (11 page(s), 8/25/1983)
- ML20080C364 - Forwards listed reactor coolant pump drawings per 830818 FOIA Request 83-448 re pump problems. (11 page(s), 9/16/1983)
- ML20080C485 - Preliminary Rev 0 to "Pressurized Performance," test results rept for 830603-17. (6 page(s), 8/20/1983)
- ML20080C493 - Preliminary Rev 0 to "Loose Parts & Vibration Monitoring Sys Hot Functional," test results rept for 830506-0607. (4 page(s), 6/14/1983)
- ML20080C434 - Draft 7 of preliminary Rev 0 to "Pre-Core Turbine Bypass Control Sys Test," test results rept for 830601-0705. (20 page(s), 9/17/1983)
- ML20080C560 - Preliminary Rev 0 to "Pre-Core Instrumentation Correlation," test results rept for 830516-0701. (31 page(s), 10/5/1983)
- ML20080C320 - Task interface agreement action plan re RCS damage discovered during evaluation of hot functional testing. (1 page(s), 8/16/1983)
- ML20080C506 - Preliminary Rev 0 to "Main & Auxiliary Transformer Backfeed," test results rept for 830420-0515. (5 page(s), 7/21/1983)
- ML20080C520 - Preliminary Rev 0 to "RCS Expansion Measurements," test results rept for 830411-0715. (3 page(s), 7/27/1983)