Home > NRC Library > ADAMS Public Documents
Forwards description of mod details to ESF actuation sys providing capability for on-line testing of instrumentation logic.Mod installation scheduled for 850309.W/15 oversize drawings.Aperture cards in PDR.
Accession Number: ML20080B046
Date Released: Saturday, October 3, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20080B043 - Forwards description of mod details to ESF actuation sys providing capability for on-line testing of instrumentation logic.Mod installation scheduled for 850309.W/15 oversize drawings.Aperture cards in PDR. (24 page(s), 1/30/1984)
- ML20263K696 - "Elementary Diagram:LP Inj Contmt Iso From DHP-1A,DHV-5 ES MCC 3A1." No drawing date. (1 page(s), 1/30/1984)
- ML20263K699 - "Elementary Diagrams:Engineered Safeguards." No drawing date. (1 page(s), 1/30/1984)
- ML20263K700 - "Elementary Diagrams:Engineered Safeguards." No drawing date. (1 page(s), 1/30/1984)
- ML20263K703 - "Elementary Diagrams:Engineered Safeguards." No drawing date. (1 page(s), 1/30/1984)
- ML20263K706 - "Elementary Diagram:Nuclear Service Water Inlet Iso to Reactor Building (SWV-109)." No drawing date. (1 page(s), 1/30/1984)
- ML20263K708 - "Elementary Diagrams:DH Removal Pump 3A (DHP-1A) 4160V ES Bus 3A,Unit 3A4." No drawing date. (1 page(s), 1/30/1984)
- ML20263K711 - "Elementary Diagrams:Engineered Safeguard." No drawing date. (1 page(s), 1/30/1984)
- ML20263K713 - "Elementary Diagrams:Engineered Safeguard." No drawing date. (1 page(s), 1/30/1984)
- ML20263K716 - "Elementary Diagrams:Engineered Safeguard." No drawing date. (1 page(s), 1/30/1984)
- ML20263K718 - "Elementary Diagrams:Engineered Safeguard." No drawing date. (1 page(s), 1/30/1984)
- ML20263K721 - "Elementary Diagrams:Engineered Safeguard." No drawing date. (1 page(s), 1/30/1984)