Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for two categories of documents re IDCOR program.Forwards App A & B documents.Documents placed in PDR.
Accession Number: ML20080A074
Date Released: Saturday, October 26, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20080F494 - Responds to FOIA request for two categories of documents re IDCOR program.Forwards App A & B documents.Documents placed in PDR. (5 page(s), 12/21/1983)
- ML20082K461 - Comments on second draft of containment leak rate estimate rept.Rept appears to dismiss penetration failure due to temp effects as mode of early containment failure. (1 page(s), 11/23/1983)
- ML20080F634 - Technical Rept 3.1, "Define Initial Likely Sequences." (150 page(s), 6/30/1982)
- ML20082U588 - Summarizes comments re outline for source term rept, NUREG-0956.Chapter IV should include results of Containment Behavior Group & Containment Loading Group activities. Section on generalization of results should be added. (3 page(s), 11/28/1983)
- ML20080F663 - "Analysis of In-Vessl Core Melt Progression (Subtask 15.1), Vol IV: User Manual & Modeling Details for Fission Product Release & Transport Code," final rept. (134 page(s), 6/30/1983)
- ML20082G291 - Requests submittal of revised input to severe accident issue papers by 831114,per DF Ross 831028 memo.Comments should be submitted to G Bagchi of Equipment Qualification Branch. (1 page(s), 11/7/1983)
- ML20080F521 - Forwards questionnaire for containment loads,to be completed by 830627.Working group objectives & schedule listed. (7 page(s), 6/2/1983)
- ML20080F530 - Forwards comments on issue paper re characteristics & likelihood of leakage resulting from external events. Comments should be used w/discretion. (4 page(s), 11/15/1983)
- ML20080F671 - Technical Rept 15.1A, "In-Vessel Core Melt Progression Phenomena." W/870313 release ltr. (76 page(s), 7/31/1983)
- ML20080F586 - Submits draft info re process for closure of technical issues. (3 page(s), 11/23/1983)
- ML20082U788 - Forwards revised outline incorporating comments received to date for NUREG-0956, "Reassessment of Accident Source Term Evaluation Methods & Assumptions." Div of Risk Analysis assistance required.Production schedule encl. (4 page(s), 11/2/1983)
- ML20080F628 - Technical Rept 2.1, "Ground Rules for Industry Degraded Core Rulemaking Program." (139 page(s), 4/30/1982)
- ML20080F661 - "Analysis of In-Vessel Core Melt Progression (Subtask 15.1), Vol III:User Manual & Modeling Details for BWR Core Heatup Code," final rept. (90 page(s), 6/30/1983)
- ML20080F544 - Technical Rept 12.1, "Hydrogen Generation During Severe Core Damage Sequences." (115 page(s), 6/30/1983)
- ML20080F506 - Summarizes work re containment behavior in revised source term estimates.Directors advised to provide representatives w/containment behavior group.Agenda listed for group.W/o encl. (3 page(s), 6/15/1983)
- ML20080F640 - "Analysis of In-Vessel Core Melt Progression (Subtask 15.1), Vol II:User Manual & Modeling Details for PWR Core Heatup Code," final rept. (136 page(s), 6/30/1983)
- ML20080F581 - Forwards draft feasibility study for containment performance under severe accident conditions for large dry PWR,in preparation for 831202 meeting.Proposed agenda encl. (3 page(s), 11/21/1983)
- ML20080H353 - Forwards final rept for Subtask 3.3, "Selection of Dominant Sequences - Update." (1 page(s), 6/14/1983)
- ML20080F614 - "Assessment of Existing Data on Zirconium Oxidation Under Hypothetical Accident Conditions in LWRs." (118 page(s), 12/21/1983)
- ML20080F575 - Technical Rept 12.3, "Hydrogen Combustion in Reactor Containment Bldgs." (350 page(s), 10/31/1983)
- ML20080F514 - Submits desired format & schedule to follow re containment failure models for severe accident source term estimates. Source term effort calls for availability of containment response model by 831101.Questionnaire & Table 1 encl. (4 page(s), 5/12/1983)
- ML20080F732 - Technical Rept 14.1A, "Key Phenomenological Models for Assessing Explosive Steam Generation Rates." (154 page(s), 6/30/1983)
- ML20080T414 - Forwards,for review & comment,second draft "Containment Performance Working Group Containment Leak Rate Estimates." (109 page(s), 10/13/1983)
- ML20080A070 - Discusses approach to addressing steam spike containment loading issue in severe accident sequence,raised at SARP Senior Review Group 830607 meeting. (13 page(s), 7/5/1983)
- ML20082G365 - Discusses 830915 request that draft position papers be prepared for technical issues important to severe accident decisions for existing nuclear power plants.Summary of weaknesses needing correction or actions to avoid encl. (8 page(s), 10/28/1983)
- ML20082D941 - Forwards tone for R Mattson 831118 ACRS briefing & 831121 IDCOR meeting re severe accident policy status. (2 page(s), 11/9/1983)
- ML20080F537 - Forwards schedule of key NRC/industry degraded core rulemaking technical exchange meetings on severe accidents. Comments on encl agenda/schedule requested by 831209. (6 page(s), 11/25/1983)
- ML20080F528 - Forwards comments on issue papers.Technical issue info paper re potential for basemat penetration encl. (11 page(s), 11/16/1983)
- ML20080H975 - Summary of 830807-12 site visit & IDCOR meeting in Chicago, IL re status of data collection activity & containment capability. (5 page(s), 9/12/1983)
- ML20080F703 - Industry degraded core rulemaking Subtask 15.3, "Core-Concrete Interactions," final rept. (112 page(s), 3/31/1983)
- ML20080F594 - Technical Rept 14.1B, "Key Phenomenological Models for Assessing Nonexplosive Steam Generation Rates." (116 page(s), 6/30/1983)
- ML20080F742 - Technical Rept 15.2B, "Debris Coolability,Vessel Penetration & Debris Dispersal." (120 page(s), 8/31/1983)
- ML20080T462 - Forwards input for Commission paper on severe accident issues.Comments by 831021 requested. (17 page(s), 10/14/1983)
- ML20080M325 - Provides guidance re containment leak area estimate responsibilities for participating groups.Study completion date remains end of Nov 1983. (6 page(s), 9/22/1983)
- ML20080F684 - Technical Rept 15.2A, "Effects of Hypothetical Core Melt Accident on PWR Vessel W/Top-Entry Instruments." W/870313 release ltr. (114 page(s), 6/30/1983)
- ML20080F686 - Forwards final rept on industry degraded core rulemaking Subtask 15.3, "Core-Concrete Interactions," for comments. (1 page(s), 7/11/1983)
- ML20082P566 - Advises of 831129-30 & 1201 meetings w/IDCOR in Harpers Ferry,WV to discuss accident phenomenology & containment loading.Agenda encl. (7 page(s), 11/14/1983)
- ML20080F558 - "Hydrogen Distribution in Reactor Containment Bldgs (Subtask 12.1)," final rept,Vol 1:project overview. (600 page(s), 4/30/1983)
- ML20081L237 - Provides estimates for containment response under severe accident conditions,per RM Bernero 830512 request.Research needed to fund both EG&G & BNL technical assistance contracts to prevent work stoppage. (2 page(s), 11/7/1983)
- ML20080F606 - "Analysis of In-Vessel Core Melt Progression (Subtask 15.1), Vol 1:Phenomenological & Modeling Background for PWR & BWR Core Heatup Codes," final rept. (87 page(s), 5/31/1983)
- ML20080F541 - Industry degraded core rulemaking (IDCOR) Subtask 3.3, "Selection of Dominant Sequences - Update," final rept. (100 page(s), 6/14/1983)
- ML20080F604 - Forwards comments on Issue 1.3.6 re characteristics & likelihood of leakage resulting from internal missiles. (4 page(s), 11/15/1983)
- ML20080F609 - Forwards revised list of severe accident issue paper assignments proposed in 830915 memo.Changes reflect discussions & agreements among NRC issue area leaders. (5 page(s), 9/22/1983)
- ML20080F599 - Summary of industry degraded core rulemaking (IDCOR) 830512 info meeting w/Technology for Energy Corp & EPRI in Rockville,MD re IDCOR planned product & NRC comments on planned product. (1 page(s), 5/18/1983)
- ML20080F648 - IDCOR Subtask 3.2, "Assess Dominant Sequences." (200 page(s), 12/21/1983)