Home > NRC Library > ADAMS Public Documents
Forwards Temporary Change Number (TCN) TCN-1 to Rev 2 to PDB-F0001, "COLR for PNPP,Unit 1 Cycle 5 (Reload 4)," incorporating plant operating limit for single loop operation,approved for PNPP by NRC in License Amend 61.
Accession Number: ML20078S020
Date Released: Wednesday, April 1, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20078S016 - Forwards Temporary Change Number (TCN) TCN-1 to Rev 2 to PDB-F0001, "COLR for PNPP,Unit 1 Cycle 5 (Reload 4)," incorporating plant operating limit for single loop operation,approved for PNPP by NRC in License Amend 61. (1 page(s), 2/14/1995)
- ML20078S022 - Temporary Change Number (TCN) TCN-1 to Rev 2 to "COLR for PNPP,Unit 1 Cycle 5 (Reload 4)," incorporating TS Amend 61, single loop operation,limiting MAPLHGR factors to 0.80. (24 page(s), 1/23/1995)