NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards SER advising that,pending verification that emergency procedures for flooding events can be implemented in timely manner,issues raised in Section 4.1.2 of NUREG-0826 re Quabbin Reservoir dam resolved.

Accession Number: ML20078R968

Date Released: Saturday, October 26, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer