NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards schedule & anticipated work duration for each basic activity re final overall decommissioning work plan package for Edgemont project.Engineering repts re haul road & maint facility const preparatory activites also encl for review.

Accession Number: ML20078C049

Date Released: Saturday, October 26, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer