NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Startup Physics Testing Rept,Cycle 17." Aspects of startup physics testing listed.Cycle 17 first Monticello cycle to utilize core loading which includes 8 bundles of Siemens 9x9-IX (also called ATRIUM 9B) design.

Accession Number: ML20077S435

Date Released: Tuesday, March 31, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer