Home > NRC Library > ADAMS Public Documents
Forwards safety evaluation & Franklin Research Ctr technical evaluation rept, "ECCS Repts (F-47) Action Plan Requirements,Toledo Edison Co,Davis-Besse Nuclear Power Station,Unit 1." NUREG-0737,Item II.K.3.17 requirements met.
Accession Number: ML20077K153
Date Released: Tuesday, March 2, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20078D855 - Forwards safety evaluation & Franklin Research Ctr technical evaluation rept, "ECCS Repts (F-47) Action Plan Requirements,Toledo Edison Co,Davis-Besse Nuclear Power Station,Unit 1." NUREG-0737,Item II.K.3.17 requirements met. (4 page(s), 9/1/1983)
- ML20077K150 - "ECCS Repts (F-47),TMI Action Plan Requirements, Davis-Besse Nuclear Power Station,Unit 1," technical evaluation rept. (14 page(s), 11/24/1982)