Forwards L Frank,J Rajan,C McCracken,L Marsh,M Phillips & J Spraul testimony on listed contentions.
Accession Number: ML20071A397
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20071A394 - Forwards L Frank,J Rajan,C McCracken,L Marsh,M Phillips & J Spraul testimony on listed contentions. (2 page(s), 2/22/1983)
- ML20071A398 - Testimony of JR Rajan re flow-induced tube vibrations in Model D steam generators.If corrective mods unavailable before Unit 1 OL received,util would have to justify interim operation.Prof qualifications encl. (9 page(s), 2/22/1983)
- ML20071A405 - Testimony of LB Marsh,L Frank & JR Rajan re steam generator tube degradation.Concurrent steam generator tube rupture & other DBA events beyond current design bases.Prof qualifications encl. (13 page(s), 2/22/1983)
- ML20071A410 - Testimony of L Frank re steam generator tube degradation. Discusses insp of tubes & measures taken to ensure tube integrity & minimize potential for degradation.Prof qualifications encl. (13 page(s), 2/22/1983)
- ML20071A412 - Testimony of CE McCracken on primary & secondary water chemistry control & corrosion re steam generator tube integrity.Numerous changes in design & procedures incorporated.Prof qualifications encl. (10 page(s), 2/22/1983)
- ML20071A416 - Testimony of M Phillips on emergency planning issues.Util onsite emergency plan complies w/NRC emergency planning requirements w/some exceptions. (24 page(s), 2/22/1983)
- ML20071A418 - Testimony of JG Spraul re adequacy of util QA program.Util organization provides QA dept w/sufficient independence from cost & schedule,authority to carry out QA operations & access to mgt.Prof qualifications encl. (13 page(s), 2/22/1983)