Home > NRC Library > ADAMS Public Documents
Forwards Refuel 9 insp plan for OTSGs & documents that serve as technical basis for overall disposition strategy of low signal-to-noises.
Accession Number: ML20069M635
Date Released: Monday, March 23, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20069M632 - Forwards Refuel 9 insp plan for OTSGs & documents that serve as technical basis for overall disposition strategy of low signal-to-noises. (10 page(s), 4/19/1994)
- ML20069M654 - "Crystal River Unit 3 Steam Generator Reg Guide 1.121 Evaluation," Rev 2. (89 page(s), 4/19/1994)
- ML20069M673 - "Exam of Crystal River Unit 3 SG Tube Sections," final rept. (248 page(s), 1/31/1994)
- ML20069M681 - "Evaluation of Crystal River Unit 3 (CR-3) Steam Generator Tube Wall Degradation." (46 page(s), 2/24/1994)
- ML20069M695 - Rev 0 to "Statistical Analysis of Defect Depth of SG Tubes." (19 page(s), 4/8/1994)
- ML20069M709 - Rev 0 to "CR-3 Analysis of S/N ECT Data for SG Tubes." (47 page(s), 4/8/1994)
- ML20069M716 - "Allowable Tube Wall Degradation for Pit-Type Defects." (7 page(s), 3/25/1994)
- ML20069M724 - Draft Rev 1 to "Crystal River Unit 3 Eddy Current Data Analysis Guidelines." (48 page(s), 4/10/1994)