NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Human Factors Engineering Control Room In-Progress Audit." Requests schedule for NRC final control room design audit,including close-out of TMI Action Plan Item I.D.1 & II.K.3.27 prior to licensing.

Accession Number: ML20069K623

Date Released: Tuesday, March 2, 2021

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer