Home > NRC Library > ADAMS Public Documents
Forwards response to NRC 940303 request for addl info, addressing concerns related to seismic loading of control center HVAC sys during peak loading periods.
Accession Number: ML20069F099
Date Released: Monday, March 23, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20069F095 - Forwards response to NRC 940303 request for addl info, addressing concerns related to seismic loading of control center HVAC sys during peak loading periods. (200 page(s), 6/3/1994)
- ML20069F118 - Rev 1 to evaluation calculation, "Response to Concern 12." (205 page(s), 5/31/1994)
- ML20069F135 - Rev 1 to evaluation calculation, "Response to Concern 16." (74 page(s), 5/31/1994)
- ML20069F141 - Rev 1 to evaluation calculation, "Response to Concern 19." (32 page(s), 5/31/1994)
- ML20069F162 - Design calculation, "Qualification for QAI Duct Supports in Stress Rept 2848-1." (191 page(s), 7/20/1984)