Home > NRC Library > ADAMS Public Documents
Forwards JG Keppler,D Hood,J Gilray,RJ Cook,RB Landsman, RN Gardner & WD Shafer testimony on QA.
Accession Number: ML20066B024
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20066B022 - Forwards JG Keppler,D Hood,J Gilray,RJ Cook,RB Landsman, RN Gardner & WD Shafer testimony on QA. (4 page(s), 10/29/1982)
- ML20066B043 - Testimony of JG Keppler supplementing Jul 1981 testimony re QA.Soils remedial work should be permitted to continue. Third-party assessments will be performed,NRC insp effort increased & work authorization controls imposed by NRC. (152 page(s), 10/29/1982)
- ML20066B057 - Testimony of D Hood re loose sands beneath svc water piping. Related events prior to & after 820316 notification of loose sands discussed.Dewatering control during plant operation can be limited w/proposed corrections. (8 page(s), 10/29/1982)
- ML20066B068 - Testimony of JW Gilray re plant QA program for underpinning activities on svc water pump structure & auxiliary bldg. Util revised QA plan for soils remedial work acceptable to NRC. (5 page(s), 10/29/1982)