Home > NRC Library > ADAMS Public Documents
Forwards LERs 78-066/03L-0,78-067/03L-0 & 78-068/03L-0.
Accession Number: ML20064C514
Date Released: Wednesday, March 18, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20064C512 - Forwards LERs 78-066/03L-0,78-067/03L-0 & 78-068/03L-0. (1 page(s), 10/16/1978)
- ML20064C516 - LER 78-066/03L-0:on 780914,NRC inspector noted that diesel generator 1B air start reservoir pressure less than 200 psig.Caused by leaking air compressor relief valve/check valve.Personnel instructed to follow FNP-1-AP-52. (3 page(s), 10/16/1978)
- ML20064C522 - LER 78-067/03L-0:on 780917,during change from hot to cold shutdown,both containment spray pumps tagged out.Caused by defective procedure. (1 page(s), 10/16/1978)
- ML20064C530 - LER 78-068/03L-0:on 780917,during Surveillance Test Procedure FNP-L-STP-40.3,diesel generator JB auto-started, but frequency would not increase over 58.5Hz.Caused by loose coupling between dc motor & potentiometer. (1 page(s), 10/16/1978)