NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards safety evaluation accepting plant design & proposed method for dealing w/station blackout.Schedule for implementation of required hardware & procedure mods should be provided within 30 days.W/contractor Rept SAIC-89/1151.

Accession Number: ML20063P934

Date Released: Tuesday, March 2, 2021

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer