NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards draft safety evaluations of SEP Topics III-6 re seismic design considerations & SEP III-11 re component integrity.Licensee proposal re dedicated hot shutdown sys will be evaluated during integrated assessment of facility.

Accession Number: ML20063N737

Date Released: Friday, October 25, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer