Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for documents re spent fuel proceeding & fuel loading during 790101-820610.Forwards documents in App A.Relevant remaining documents available in PDR.
Accession Number: ML20063F911
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20063F904 - Responds to FOIA request for documents re spent fuel proceeding & fuel loading during 790101-820610.Forwards documents in App A.Relevant remaining documents available in PDR. (3 page(s), 7/12/1982)
- ML20063F917 - Forwards Press Release R-II re resumption of NRC hearing in Oconee-McGuire spent fuel proceeding on 800428 in Charlotte,NC. (1 page(s), 4/16/1980)
- ML20063F930 - Press Release R-II re resumption of NRC hearing in Oconee- McGuire spent fuel proceeding on 800428 in Charlotte,NC. Amend would authorize Duke Power Co to transport spent irradiated fuel for storage in spent fuel pool. (1 page(s), 4/16/1980)
- ML20063F931 - Forwards Press Release 81-13 discussing NRC authorization for fuel loading/zero power testing at facility. (1 page(s), 1/26/1981)
- ML20063F935 - Press Release 81-13 discussing NRC authorization for fuel loading/zero power testing at facility.Further licensing must await Commission action after further public hearing on OL application has been conducted by ASLB. (1 page(s), 1/26/1981)
- ML20063F940 - Forwards press release discussing resumption of NRC hearing re facility on 810224. (1 page(s), 2/5/1981)
- ML20063F944 - Press release discussing resumption of NRC hearing re facility on 810224.Carolina Environ Study Group granted motion to reopen hearing record on contentions re hydrogen control issue. (1 page(s), 2/5/1981)
- ML20063F948 - Forwards Press Release 81-96 re NRC authorization for util to operate facility at 5% full power. (1 page(s), 6/15/1981)
- ML20063F953 - Press Release 81-96 discussing NRC authorization to operate facility at 5% full power.Commissioners conducting review of ASLB decision re issuance of full power,full term license. (1 page(s), 6/12/1981)
- ML20063F959 - Forwards Press Release 81-109 re NRC authorization for full power operation of facility. (1 page(s), 7/8/1981)
- ML20063F969 - Press Release re NRC authorization for util to operate facility at full power.Commission approved full power operation in 810629 order. (1 page(s), 7/8/1981)
- ML20063G004 - Forwards press release announcing ASLAB hearing re Carolina Environ Study Group appeal of ASLB decisions authorizing facility operation. (1 page(s), 8/31/1981)
- ML20063F991 - Press release announcing ASLAB 810910 hearing re Carolina Environ Study Group appeal of ASLB decisions authorizing facility operation. (1 page(s), 8/31/1981)
- ML20063G010 - Recommends that Bevill rept dates be revised per listed dates & forwards 811202 ltr outlining current schedule for completion of facility.W/o encl. (1 page(s), 12/16/1981)