Forwards LERs 82-030/03L-0,82-064/03L-0 & 82-033/03L-0.
Accession Number: ML20063D149
Date Released: Tuesday, March 17, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20063D145 - Forwards LERs 82-030/03L-0,82-064/03L-0 & 82-033/03L-0. (1 page(s), 6/25/1982)
- ML20063D161 - LER 82-030/03L-0:on 820526,during cold shutdown,preparations for filling reactor coolant loop A resulted in RCS boron dilution.Caused by temporary malfunction of boric acid flow controller.Controller functioning properly. (2 page(s), 6/25/1982)
- ML20063D172 - LER 82-064/03L-0:on 820530,w/unit at 100% power,charging pump svc water pump 1-SW-P-10B failed to develop sufficient discharge pressure.Caused by insufficient NPSH.Svc water to chillers throttled. (3 page(s), 6/25/1982)
- ML20063D178 - LER 82-033/03L-0:on 820530,w/unit at 96% power,charging pump svc water pump 2-SW-P-10B failed to develop sufficient discharge pressure.Caused by insufficient NPSH.Svc water to chillers throttled. (3 page(s), 6/25/1982)