NRC Logo

Home > NRC Library > ADAMS Public Documents

Responds to 930526 petition filed persuant to 10CFR2.206 re delay of scheduled startup of Pilgrim Nuclear Power Station until hardware modifications designed to eliminate errors in reactor water level measurement made.Petition denied.W/encl.

Accession Number: ML20058P174

Date Released: Friday, November 6, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer