Home > NRC Library > ADAMS Public Documents
Forwards addl follow-up response to open & unresolved items noted in Electrical Distribution Sys Functional Insp Rept 50-155/92-19 on 920817-0922,per 921223 response.
Accession Number: ML20058N620
Date Released: Friday, October 25, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20058N617 - Forwards addl follow-up response to open & unresolved items noted in Electrical Distribution Sys Functional Insp Rept 50-155/92-19 on 920817-0922,per 921223 response. (9 page(s), 10/11/1993)
- ML20058N622 - "Big Rock-Min Station Power Bus Voltage Levels When Fed From 46 kV Sys & 2,400-Volt Volt Regulator Out of Svc." (27 page(s), 4/13/1993)
- ML20058N633 - Rev 142 to Vol 3 of Operating Procedure - Sys SOP-14, "Substation." (34 page(s), 7/15/1993)
- ML20058N636 - Rev 0 to Engineering Analysis, "EDG Cooling Water Pump Net Positive Suction Head Requirements." (10 page(s), 4/19/1993)
- ML20058N640 - Rev 20 to Procedure T7-28, "Emergency Diesel Generator Auto Test Start." (80 page(s), 7/15/1993)
- ML20058N642 - Rev 16 to Vol of Administrative Procedures,Procedure 3.2.1, "Maint Order Processing," pages 21 & 22. (2 page(s), 10/11/1993)