Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for documents re IE Insp Rept 50-358/81-13.Forwards documents listed in Apps A & B.App B documents completely & partially withheld (ref FOIA Exemption 7 & 10CFR9.5(a)(7)).
Accession Number: ML20058A387
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20058E546 - Responds to FOIA request for documents re IE Insp Rept 50-358/81-13.Forwards documents listed in Apps A & B.App B documents completely & partially withheld (ref FOIA Exemption 7 & 10CFR9.5(a)(7)). (7 page(s), 6/9/1982)
- ML20058E828 - Requests copies of all documents relevant to investigation at facility,prior to termination of employment. (1 page(s), 2/2/1982)
- ML20058E611 - Requests evaluation of problems identified during facility investigation.List of problems encl. (5 page(s), 5/6/1981)
- ML20058A389 - Requests confirmation of NRC understanding re investigation of const-related problems concerning QA staffing,separation between Kaiser const & Kaiser QA/QC,training,voiding of nonconformance repts & audit program. (3 page(s), 4/8/1981)
- ML20058E570 - Expresses appreciation for assistance in investigation of facility. (1 page(s), 2/17/1981)
- ML20058E769 - Discusses replacement of Weld CY-516.If replacement is consequence of radiographic test,other welds should be reviewed. (1 page(s), 9/4/1981)
- ML20058E615 - Forwards independent verification program in support of investigation at site. (2 page(s), 5/12/1981)
- ML20058E592 - Discusses 810415 contact w/Div Administrator for Highways in State of OH re potential welding problems associated w/ Bristol Steel & Iron structural steel. (1 page(s), 4/22/1981)
- ML20058E596 - Recommends actions resulting from investigation of facility.Licensee shall be required to tabulate all small bore piping in sys important to safety where QA inspector failed to verify proper fit-up prior to welding. (2 page(s), 4/22/1981)
- ML20058E695 - Forwards relevant sections of investigation repts dealing w/concerns expressed by V Griffin in 1976 re unapproved vendors.W/o encl. (1 page(s), 7/28/1981)
- ML20058E578 - Discusses 810223 telcon w/T Applegate re investigation at facility.Applegate agreed to provide further info re allegations & stated that util can hide info faster than NRC investigators can uncover it. (3 page(s), 2/25/1981)
- ML20058E642 - Provides documentation of insp activity re allegation concerning traceability of matls in diesel generator rooms at facility. (9 page(s), 6/22/1981)
- ML20058E555 - Forwards J Sniezek 811027 memo re evaluation of implementation of reactor const insp program at facility. W/o memo. (1 page(s), 10/30/1981)
- ML20058E600 - Responds to 810421 request for comments re independent verifications to support investigation at facility.Memo should be delayed until licensee program for confirming adequacy of const is finalized. (4 page(s), 4/24/1981)
- ML20058E588 - Advises that P Barrett did outstanding job during recent meeting w/Cincinnati Gas & Electric Co. (1 page(s), 4/14/1981)
- ML20058A383 - Recommends that Licensing Board be notified of investigation of Applegate allegations re quality problems w/structural beam welds,matl traceability,conformance w/welding code provisions.Completion by 810527 requested. (4 page(s), 4/29/1981)
- ML20058E566 - Discusses 820219 telcon w/T Applegate re investigation of allegations concerning facility on several occasions. Applegate stated concern for his life.Contacting of local law enforcement officials recommended. (2 page(s), 2/23/1981)
- ML20058E787 - Forwards info re Sargent & Lundy audit of facility. Unacceptable indications present at Film Markers 8-12. (3 page(s), 9/30/1981)
- ML20058E668 - Assigns tasks & discusses recommendations for remaining subsections of investigation of Applegate allegations.Draft Allegation 1 encl. (8 page(s), 7/14/1981)
- ML20058E793 - Discusses meeting re facility.Further decision on addl independent measurements will be delayed until QC program is further along. (1 page(s), 11/10/1981)
- ML20058E582 - Forwards comments on first Applegate allegation write-up. Format should be as stated in 810209 memo. (7 page(s), 3/9/1981)
- ML20058E776 - Expresses appreciation for assistance in preparation of rept re facility. (1 page(s), 9/10/1981)
- ML20058E622 - Advises that there is no valid basis for Govt Accountability Project request for work stoppage at facility.Proper control of future work & correction of past QA problems is more preferable course of action. (1 page(s), 5/28/1981)
- ML20058E728 - Forwards limited test program slated for 810824-0904. (3 page(s), 8/20/1981)
- ML20058E627 - Forwards summary of facility investigation. (2 page(s), 6/12/1981)
- ML20058E938 - Notifies of receipt of addl allegations re facility on 810422.Individual expressed concern w/QC program & failure of licensee to correct deficiencies identified in noncompliance repts.Info partially deleted. (3 page(s), 4/30/1981)
- ML20058E653 - Discusses 810706 telcon w/T Applegate re ongoing NRC investigation at facility.Several key persons identified to NRC still require interviews. (2 page(s), 7/8/1981)
- ML20058E618 - Documents 810513 discussion w/T Daniels re facility.Basis for shutdown of project should be evaluated. (1 page(s), 5/14/1981)
- ML20058E677 - Comments on JG Keppler 810506 memo, "Evaluation of Problems Identified,Zimmer Investigation." Final conclusions re effectiveness of insp program should be reserved until util has completed reviews. (2 page(s), 7/16/1981)
- ML20058E750 - Forwards independent verification program scheduled for 810908-0925. (3 page(s), 8/28/1981)
- ML20058E711 - Forwards list of nonconformance repts contained in files. (2 page(s), 8/18/1981)
- ML20058E964 - Requests in-depth investigation of 1978 electrical allegations per J Foster 810814 memo & attachment thereto. (1 page(s), 9/8/1981)
- ML20058E630 - Requests review of draft investigation of facility upon completion. (1 page(s), 6/23/1981)
- ML20058E731 - Forwards revised limited test program scheduled for 810824- 0904. (3 page(s), 8/21/1981)
- ML20058E558 - Discusses investigation resulting from govt accountability project question re previous investigation of Applegate allegations.Sworn statements should be obtained from allegers. (2 page(s), 2/9/1981)
- ML20058E632 - Forwards documentation of insp activity re allegation concerning traceability of matls in diesel generator rooms at facility. (1 page(s), 7/6/1981)
- ML20058E801 - Forwards slide presentation entitled "Six-Inch Pipe Weld QA Presentation," from 811113 meeting w/util. (1 page(s), 12/11/1981)
- ML20058E780 - Comments on Ofc of Inspector & Auditor special inquiry re adequacy of IE Investigation Rept 50-358/80-09.Investigation did not determine whether planned corrections resulted from Applegate allegations. (2 page(s), 10/1/1981)
- ML20058E688 - Summary of 810714 meeting re status of independent verifications at facility & to further elaborate plans. Action plan will be developed to define detail,schedule & indicate personnel/organization assignments. (2 page(s), 7/24/1981)
- ML20058E808 - Slide presentation entitled "Six-Inch Pipe Weld QA Presentation," from 811113 meeting w/util. (61 page(s), 12/11/1981)
- ML20058E856 - Discusses 820218 ACRS Subcommittee meeting in Cincinnati,OH to review safety significance of QA problems associated w/ const of facility. (1 page(s), 3/9/1982)
- ML20058E898 - Provides guidance for reactor const insp program evaluation of facility.Draft rept should be issued on 811201 & final rept by 811215.Const insp program evaluation encl. (4 page(s), 10/27/1981)
- ML20058F026 - Notifies of addl allegations re facility reported by US Testing Co on 781012.Concerns expressed re cable pulling, cable storage,nonconformance repts & design changes.Info partially deleted. (3 page(s), 8/14/1981)
- ML20058E850 - Lists documents & investigation leads which were turned over to enforcement & investigation staff.Records should be maintained pending completion of civil or criminal litigation. (2 page(s), 2/25/1982)
- ML20058E816 - Requests review of facility files & compilation of representative list of observations indicative of util mgt attitudes by 820118. (1 page(s), 1/5/1982)
- ML20058E873 - Outlines content of IE Insp Repts 50-358/76-02, 50-358/77-03 & Henry J Kaiser Co QA Surveillance Rept 317 re matl procurement at facility. (3 page(s), 4/8/1982)
- ML20058E879 - Forwards facility info for briefing of Commissioner Palladino re status of facility const project. (5 page(s), 1/22/1982)
- ML20058E843 - Notifies of Ofc of Inspector & Auditor Jul 1981 request for maint of 72 nonconformance repts. (1 page(s), 2/23/1982)
- ML20058E861 - Advises that JB McCarten prepared records sent by Region 3 to A Schnebelen on 820223.Copy made of largest package. (1 page(s), 3/15/1982)
- ML20058E869 - Provides guidance for handling noncompliance repts generated in quality confirmation program. (1 page(s), 3/31/1982)
- ML20058E833 - Advises that dummy insp procedure number has been issued for quality confirmation program at facility.Number is 099022B & entitled "Zimmer Quality Confirmation Program." (1 page(s), 2/8/1982)
- ML20058E923 - Advises that reactor const insp program evaluation has been canceled due to reassignment of E Blackwood.Draft IE Insp Rept 50-358/81-13 dtd 810815 encl. (370 page(s), 11/9/1981)
- ML20058A627 - Requests meeting to discuss & delinate tasks to be accomplished re facility investigation.Topics to be discussed listed. (1 page(s), 3/22/1982)
- ML20058F033 - Notifies of 810114 telcon reporting allegations re facility QC insps.Info partially deleted. (10 page(s), 1/16/1981)
- ML20058F100 - Advises that final IE Investigation Rept 50-358/81-13 represents collective view of participants & mgt.Rept issuance will not be delayed for receipt of new signatures on cover page. (1 page(s), 11/23/1981)
- ML20058F104 - Discusses allegations re Powell valves,reported by individual on 820310.Info partially deleted.Items included Class 1,2 & 3. (2 page(s), 4/2/1982)
- ML20058F159 - Computer printout re IE Insp Rept 50-358/81-13 in response to Govt Accountability Project 820420 FOIA request. (56 page(s), 5/7/1982)
- ML20058F055 - Notifies of 801112 allegation re lowering of welding requirements.Info partially deleted. (1 page(s), 2/3/1981)
- ML20058F113 - Forwards revised draft IE Investigation Rept 50-358/81-13, draft ltr to licensee & draft notice of violation & proposed imposition of civil penalty. (715 page(s), 6/9/1982)
- ML20058F141 - Discusses 801024 allegation of improper welding procedure & subsequent voiding of nonconformance rept.Info partially deleted. (2 page(s), 5/21/1981)
- ML20058F068 - Discusses 810903 telcon w/T Applegate re change of address & phone number.Applegate also expressed interest in Ofc of Inspector & Auditor rept & NRC interface w/DOJ re facility investigation. (1 page(s), 10/6/1981)
- ML20058F130 - Expresses concerns re content of investigation rept.More info required on original noncompliance issued by I Yin for improperly voiding nonconformance repts. (2 page(s), 8/4/1981)
- ML20058F077 - Forwards draft memo from JG Keppler to WJ Dircks re transmittal of investigation matl to Udall Committee. (3 page(s), 4/20/1982)
- ML20058F117 - Discusses allegations received on 811104 during onsite insp of activities re 810408 immediate action ltr.Corrective Action Request 81-21 & related nonconformance rept have not been dispositioned or returned to initiator. (1 page(s), 11/10/1981)