NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Technical Basis for Crystal River Unit 3 Plant Specific Procedure to Resolve NRC Generic Ltr 87-02" & "Florida Power Corp Plant Specific Procedure for Seismic Verification of Nuclear Plant Equipment," Rev 0.

Accession Number: ML20056G795

Date Released: Tuesday, March 10, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer