NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards LER 93-003-00 re Problem Investigation Process 0-M93-0198 covering past inoperability of Train B of CR ventilation sys due to possible fabrication/installation deficiency.

Accession Number: ML20056C235

Date Released: Tuesday, March 10, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer