Home > NRC Library > ADAMS Public Documents
Forwards addl info re soils remedial action at facilities, including verification test for permanent dewatering sys recharge time & underpinning of auxiliary bldg.W/five oversize drawings.Aperture cards are available in PDR.
Accession Number: ML20054J318
Date Released: Thursday, October 1, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20054J317 - Forwards addl info re soils remedial action at facilities, including verification test for permanent dewatering sys recharge time & underpinning of auxiliary bldg.W/five oversize drawings.Aperture cards are available in PDR. (54 page(s), 6/7/1982)
- ML20261L633 - "Auxiliary Building:Elevations K (Y=15.0),KC=(Y=0.0),and H (Y=47.5) of Underpinning Walls." (1 page(s), 5/18/1982)
- ML20261L638 - "Auxiliary Building:Plans at Elevations 574.0,584.0,and Misc Elevations of Underpinning Walls." (1 page(s), 5/18/1982)
- ML20261L640 - "Auxiliary Building:Miscellaneous Elevations of Underpinning Walls." (1 page(s), 5/18/1982)
- ML20261L645 - "Auxiliary Building Underpinning:Instrumentation Location for Strain & Settlement Monitoring." (1 page(s), 5/18/1982)
- ML20261L649 - "Auxiliary Bldg & FIVP Instrumentation System Monitoring Matrix." Sheet 1.No revision date. (1 page(s), 6/7/1982)