Home > NRC Library > ADAMS Public Documents
Outline of Suffolk County emergency preparedness concerns.
Accession Number: ML20054A658
Date Released: Thursday, March 5, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20054A657 - Outline of Suffolk County emergency preparedness concerns. (12 page(s), 4/13/1982)
- ML20054A659 - Statement of qualifications of Suffolk County witnesses. (44 page(s), 4/12/1982)
- ML20054A665 - Testimony of MW Goldsmith re Suffolk County Contention 2 on diesel generator relays. (14 page(s), 4/13/1982)
- ML20054A672 - Testimony of MW Goldsmith re Suffolk County Contention 4 on water hammer. (25 page(s), 4/13/1982)
- ML20054A674 - Testimony of MW Goldsmith re Suffolk County Contention 9 on ECCS pump blockage. (12 page(s), 4/13/1982)
- ML20054A677 - Testimony of DG Bridenbaugh & GC Minor re Suffolk County Contention 11 on passive mechancial valve failure. (27 page(s), 4/13/1982)
- ML20054A681 - Testimony of RW Capstick re Suffolk County Contention 17(a) on fire protection. (6 page(s), 4/13/1982)
- ML20054A684 - Testimony of MW Goldsmith re Suffolk County Contention 5 on loose parts monitoring. (62 page(s), 4/13/1982)
- ML20054A690 - Testimony of MW Goldsmith,SJ Harwood,RB Hubbard & GC Minor re Contention 7B on sys reliability.Certificate of Svc encl. (155 page(s), 4/13/1982)