Home > NRC Library > ADAMS Public Documents
Testimony of MW Goldsmith & GC Minor re Suffolk County & Shoreham Opponents Coalition Contentions 3 & 8,respectively, on detection of inadequate core cooling.Inadequacy of water level instrumentation demonstrated.W/Certificate of Svc.
Accession Number: ML20053B272
Date Released: Saturday, March 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20053B271 - Testimony of MW Goldsmith & GC Minor re Suffolk County & Shoreham Opponents Coalition Contentions 3 & 8,respectively, on detection of inadequate core cooling.Inadequacy of water level instrumentation demonstrated.W/Certificate of Svc. (110 page(s), 5/25/1982)
- ML20053B276 - Testimony of MW Goldsmith & GC Minor re Suffolk County Contention 18 on human factors equipment.Util failed to eliminate human factors deficiencies in control room equipment. (10 page(s), 5/25/1982)
- ML20053B282 - Testimony of MW Goldsmith,FR Ball,LT Crosse & TJ Mazour re Suffolk County Contention 19 on human factors procedures. Inadequacies of human factors consideration in operator training & in emergency procedures shown. (140 page(s), 5/25/1982)
- ML20053B304 - Testimony of DG Bridenbaugh re Suffolk County Contention 21 on Mark II containment.Util & NRC have not demonstrated that Mark II deficiencies have not affected capability of containment to withstand LOCA & transient conditions. (31 page(s), 5/25/1982)
- ML20053B305 - Testimony of DG Bridenbaugh & GC Minor re Suffolk County Contention 22 re safety/relief valve test program.Util has not adequately demonstrated reliability of program. (42 page(s), 5/25/1982)
- ML20053B306 - Testimony of RB Hubbard & GC Minor re Suffolk County & Shoreham Opponents Coalition Contentions 27 & 3, respectively,on post-accident monitoring. (28 page(s), 5/25/1982)
- ML20053B309 - Testimony of GC Minor re Suffolk County & Shoreham Opponents Coalition Contentions 27 & 3,respectively,on post-accident monitoring. (20 page(s), 5/25/1982)