Home > NRC Library > ADAMS Public Documents
Forwards LERs 82-005/03L-0,82-008/03L-0,82-009/03L-0 & 82-010/03L-0.
Accession Number: ML20052A660
Date Released: Friday, March 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20052A659 - Forwards LERs 82-005/03L-0,82-008/03L-0,82-009/03L-0 & 82-010/03L-0. (1 page(s), 3/25/1982)
- ML20052A661 - LER 82-005/03L-0:on 820226,4160-volt B train ac electrical power circuit declared inoperable when emergency bus 2G de-energized.Bus 2G de-energized when breaker 2-DG15 opened. Cause under investigation. (2 page(s), 3/25/1982)
- ML20052A663 - LER 82-008/03L-0:on 820226,instrumentation loop associated w/LI-485 (steam generator B level indication) declared inoperable when reading was out of tolerance w/other channels.Caused by obstruction in ref leg. (1 page(s), 3/25/1982)
- ML20052A667 - LER 82-009/03L-0:on 820228,instrumentation loop associated w/FT-474 (steam generator A flow transmitter) declared inoperable.Caused by leaking equalizing valve.Valve stem repaired. (1 page(s), 3/25/1982)
- ML20052A671 - LER 82-010/03L-0:on 820226,instrumentation loop associated w/LI-474 (steam generator A level indicator) declared inoperable.Caused by loss of necessary level in ref leg while steam generator not in svc.Leg refilled. (1 page(s), 3/25/1982)