Home > NRC Library > ADAMS Public Documents
NuScale Power SMR DC Submission 10
Accession Number: ML20050C872
Date Released: Friday, February 21, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20036D336 - NuScale Power, LLC Submittal of the NuScale Standard Plant Design Certification Application, Revision 4. (3 page(s), 1/16/2020)
- ML20036D414 - Part 01 - General and Financial Information - Sections 01.01 - 01.04 (Rev. 4) - Part 01 - General and Financial Information - Sections 01.01 - 01.04 (3 page(s), 1/16/2020)
- ML20036D416 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 01 - Certified Design Descriptions and Inspections, Tests, Analyses, and Acceptance Criteria - Chapters 01 - 05 (141 page(s), 1/16/2020)
- ML20036D417 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 01 - Introduction and General Description of the Plant - Sections 01.01 - 01.10 (350 page(s), 1/16/2020)
- ML20036D420 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 02 - Site Characteristics and Site Parameters - Sections 02.00 - 02.05 (25 page(s), 1/16/2020)
- ML20036D423 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Sections 03.01 - 03.06 (276 page(s), 1/16/2020)
- ML20036D424 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 1 - 265 (265 page(s), 1/16/2020)
- ML20036D425 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 266 - 307 (42 page(s), 1/16/2020)
- ML20036D427 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 308 - 345 (38 page(s), 1/16/2020)
- ML20036D430 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 346 - 482 (137 page(s), 1/16/2020)
- ML20036D431 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.08 - Design Cat I Structures - Pages 1 - 140 (140 page(s), 1/16/2020)
- ML20036D432 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.08 - Design Cat I Structures - Pages 141 - 271 (131 page(s), 1/16/2020)
- ML20036D433 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Sections 03.09 - 03.13 (183 page(s), 1/16/2020)
- ML20036D437 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Appendices 3A - 3C (311 page(s), 1/16/2020)
- ML20036D438 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 04 - Reactor - Sections 04.01 - 04.06 (203 page(s), 1/16/2020)
- ML20036D439 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 05 - Reactor Coolant System and Connecting Systems - Sections 05.01 - 05.04 (160 page(s), 1/16/2020)
- ML20036D440 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 06 - Engineered Safety Features - Sections 06.01 - 06.07 (161 page(s), 1/16/2020)
- ML20036D442 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 07 - Instrumentation and Controls - Sections 07.00 - 07.02 (303 page(s), 1/16/2020)
- ML20036D444 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 08 - Electric Power - Sections 08.01 - 08.04 (135 page(s), 1/16/2020)
- ML20036D448 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 09 - Auxiliary Systems - Section 09.01 - Appendix 9A (806 page(s), 1/16/2020)
- ML20036D450 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 10 - Steam and Power Conversion System - Sections 10.01 - 10.04 (152 page(s), 1/16/2020)
- ML20036D452 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 11 - Radioactive Waste Management - Sections 11.01 - 11.06 (168 page(s), 1/16/2020)
- ML20036D454 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 12 - Radiation Protection - Sections 12.01 - 12.05 (199 page(s), 1/16/2020)
- ML20036D456 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 13 - Conduct of Operations - Sections 13.01 - 13.07 (12 page(s), 1/16/2020)
- ML20036D458 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 14 - Initial Test Program and Inspections, Tests, Analyses, and Acceptance Criteria - Sections 14.00 - 14.03 (352 page(s), 1/16/2020)
- ML20036D460 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 15 - Transient and Accident Analyses - Sections 15.00 - 15.10 (640 page(s), 1/16/2020)
- ML20036D461 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 16 - Technical Specifications - Section 16.01 - Technical Specifications (13 page(s), 1/16/2020)
- ML20036D463 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 17 - Quality Assurance and Reliability Assurance - Sections 17.01 - 17.06 (24 page(s), 1/16/2020)
- ML20036D465 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 18 - Human Factors Engineering - Sections 18.00 - 18.12 (80 page(s), 1/16/2020)
- ML20036D466 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 19 - Probabilistic Risk Assessment and Severe Accident Evaluation - Sections 19.00 - 19.05 (426 page(s), 1/16/2020)
- ML20036D467 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 20 - Mitigation of Beyond-Design-Basis Events - Sections 20.01 - 20.04 (18 page(s), 1/16/2020)
- ML20036D468 - Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 21 - Multi-Module Design Considerations - Sections 21.01 - 21.04 (21 page(s), 1/16/2020)
- ML20036D471 - Part 03 - Applicants Environmental Report - Standard Design Certification (Rev. 4) - Part 03 - Applicants Environmental Report - Standard Design Certification - Section 1.0 - Appendix B (133 page(s), 1/16/2020)
- ML20036D473 - Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants (Rev. 4) - Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants - Volume 1 - Specifications - Chapters 01 - 05 (154 page(s), 1/16/2020)
- ML20036D474 - Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants (Rev. 4) - Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants - Volume 2 - Bases - Chapters 02 - 03 (273 page(s), 1/16/2020)
- ML20036D476 - Part 05 - Emergency Plans (Rev. 4) - Part 05 - Emergency Plans (3 page(s), 1/16/2020)
- ML20036D479 - Part 06 - Security Plans (Rev. 4) - Part 06 - Security Plans (3 page(s), 1/16/2020)
- ML20036D482 - Part 07 - Exemptions - Chapters 01 - 17 (Rev. 4) - Part 07 - Exemptions - Chapters 01 - 17 (102 page(s), 1/16/2020)
- ML20036D484 - Part 08 - License Conditions, Inspections, Tests, Analyses and Acceptance Criteria (Rev. 4) - Part 08 - License Conditions, Inspections, Tests, Analyses and Acceptance Criteria (3 page(s), 1/16/2020)
- ML20036D486 - Part 09 - Withheld Information (Rev. 4) - Part 09 - Withheld Information (4 page(s), 1/16/2020)
- ML20036D488 - Part 10 - Quality Assurance Program Description (Rev. 4) - Part 10 - Quality Assurance Program Description (3 page(s), 1/16/2020)