Responds to FOIA request for five categories of documents re CRBR.Forwards documents listed in Apps A,B & C.
Accession Number: ML20049H240
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20055B281 - Responds to FOIA request for five categories of documents re CRBR.Forwards documents listed in Apps A,B & C. (4 page(s), 7/12/1982)
- ML20054H779 - Forwards supplemental list of questions on steam generator design.Conference w/applicant on design suggested. (2 page(s), 6/22/1982)
- ML20055B283 - Forwards description of CRBR test program & detailed analysis of 820525 GAO rept re steam generator testing program. (13 page(s), 6/8/1982)
- ML20054H337 - Comments on GAO final ltr rept, "Revising CRBR Steam Generator Testing Program Can Reduce Risk." DOE rebuttal to rept & description of test program encl.W/o encl. (1 page(s), 6/8/1982)
- ML20054H334 - Comments on GAO final ltr rept, "Revising CRBR Steam Generator Testing Program Can Reduce Risk." Also forwards DOE steam generator testing program.W/o encl. (1 page(s), 6/8/1982)
- ML20055B284 - Forwards GAO final ltr rept "Revising CRBR Steam Generator Testing Program Can Reduce Risk," in response to Subcommittee on Oversight & Investigations,House Committee on Energy & Commerce request.No response required. (24 page(s), 6/7/1982)
- ML20055B286 - Discusses util cost estimates for CRBR studies per 820518 request. (7 page(s), 6/15/1982)
- ML20055B288 - Forwards proposed input to Chapter 9 & 10 to CRBR FES suppl. Info reflects comments discussed re preliminary draft. (14 page(s), 6/10/1982)
- ML20055B290 - Discusses proposed changes to Chapter 11 of FES re cost estimates.CRBR offers least cost solution in meeting programmatic objectives of LMFBR program. (1 page(s), 5/27/1982)
- ML20055B291 - Forwards task order under "On Call Assistance For Power Plant Cost Studies." Request for work endorsed & authorized by NRC. (9 page(s), 5/18/1982)
- ML20055B292 - Forwards Antitrust & Economic Analysis Branch input to accident impact section of captioned DES. (4 page(s), 5/10/1982)
- ML20055B293 - Responds to Interrogatories Set 19 re const cost of CRBR. (3 page(s), 4/16/1982)
- ML20049J483 - Solidifies NRC positions based on applicant 820216 presentation re cost of delay in licensing facility. (4 page(s), 2/19/1982)
- ML20049H247 - Forwards comments on DOE LMFBR EIS suppl per 820106 request. (3 page(s), 1/27/1982)
- ML20055B294 - Comments on DOE response to Question 9 of applicant responses to questions set forth in Commission 811224 order re estimate of cost of delay. (2 page(s), 1/22/1982)
- ML20049H239 - Submits info re cost savings associated w/early site preparation activities,in response to DOE answer to Question 320.7R in NRC 811118 ltr.Total money costs will be lower if work begins in 1982 rather than 1983 or 1984. (1 page(s), 1/15/1982)