NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "TMI-1 Reactor Bldg 15-Yr Tendon Surveillance (Insp Period 5)" Technical Rept 069.Evaluations conclude that test & insp results demonstrate TMI-1 reactor bldg post- tensioning sys in good condition.

Accession Number: ML20043A233

Date Released: Wednesday, February 26, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer