Forwards LERs 82-006/03L-0,82-014/03L-0 & 82-023/03L-0.
Accession Number: ML20042A750
Date Released: Tuesday, February 25, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20042A749 - Forwards LERs 82-006/03L-0,82-014/03L-0 & 82-023/03L-0. (1 page(s), 3/12/1982)
- ML20042A757 - LER 82-006/03L-0:on 820211,w/unit at 100% power,PT-27 revealed that amp readings for heat tracing Panel 11,circuit 6A was below acceptance criteria.Caused by excessive heat. Defective heat tracing replaced & tested. (3 page(s), 3/12/1982)
- ML20042A761 - LER 82-014/03L-0:on 820211,w/unit at 100% power,nuclear power range instrument 41 (N 41) failed.Caused by shorted (wetted) high voltage connector.Shorted connector replaced, junction box dryed out & N-41 returned to svc. (2 page(s), 3/12/1982)
- ML20042A762 - LER 82-023/03L-0:on 820212,PT-39B.2 & PT-39B.1 revealed that snubbers 1-RC-HSS-131,1-WFPD-HSS-15 & 1-SHP-HSS-35B were inoperable due to low oil reservoir level.Caused by seal leakage.Snubbers replaced &/or repaired. (2 page(s), 3/12/1981)