Home > NRC Library > ADAMS Public Documents
Forwards J Kane,D Hood,HN Singh,F Rinaldi,J Matra & WP Chen testimony for hearing scheduled to begin on 820216. Certificate of Svc encl.
Accession Number: ML20040F437
Date Released: Friday, November 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20040F436 - Forwards J Kane,D Hood,HN Singh,F Rinaldi,J Matra & WP Chen testimony for hearing scheduled to begin on 820216. Certificate of Svc encl. (4 page(s), 2/5/1982)
- ML20040F442 - Testimony of D Hood,HN Singh & J Kane re remedial measures for borated water storage tanks.Preloading procedures & const of new ring beam corrected soil settlement problem for borated water storage tanks.W/prof qualifications. (45 page(s), 2/5/1982)
- ML20040F447 - Testimony of F Rinaldi & J Matra re borated water storage tanks,emergency diesel fuel oil storage tanks & electrical duct banks.Applicant remedial measures will eliminate any structural concerns re tanks.W/prof qualifications. (30 page(s), 2/5/1982)
- ML20040F450 - Testimony of J Kane re effects of plant fill problem on foundation support for Seismic Category I underground piping.Prof qualification encl. (22 page(s), 2/5/1982)
- ML20040F452 - Testimony of WP Chen & D Hood re underground seismic Category I piping.No conclusions re adequacy of seismic Category I piping over life of plant can be made.Prof qualifications encl. (15 page(s), 2/5/1982)