Home > NRC Library > ADAMS Public Documents
Motion for summary disposition of PL Hourikan Contention 5 re availability of assured supply of usable treated municipal effluent for cooling purposes for Unit 3.No factual issues require adjudication.
Accession Number: ML20040C285
Date Released: Sunday, February 23, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20040C284 - Motion for summary disposition of PL Hourikan Contention 5 re availability of assured supply of usable treated municipal effluent for cooling purposes for Unit 3.No factual issues require adjudication. (24 page(s), 1/15/1982)
- ML20040C295 - Affidavit of RD Hulse re Contention 5,availability of cooling water for Unit 3 for purposes of determining whether effluent to be discharged from 91st Ave Plant will be adequate.EPA projections are most conservative. (44 page(s), 1/12/1982)
- ML20040C298 - Affidavit of WG Bingham re Contention 5,availability of coolant water for Unit 3. (50 page(s), 1/11/1982)
- ML20040C299 - Affidavit of J Muir,Director of Wastewater Util,Tolleson, AZ,re Contention 5,availability of coolant water for Unit 3. Certificate of Svc encl. (6 page(s), 1/12/1982)