NRC Logo

Home > NRC Library > ADAMS Public Documents

Notification of contract execution,Mod 3 to "Review of Exxon Methodology Used in BWR Reloads W/Exxon Fuel." Contractor:GA Tech Research Inst.

Accession Number: ML20040B354

Date Released: Friday, October 25, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer