NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards rept of 811217-18 site visit.Facility contains Westinghouse 3-loop reactor which has completed hot functional testing in preparation for core load in Winter 1981-82.

Accession Number: ML20040A310

Date Released: Friday, November 6, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer