Ack receipt of 810810,1117 & 1217 ltrs informing NRC of steps taken to correct nonconformance noted in QA Program Insp Rept 99900741/81-01.
Accession Number: ML20039D195
Date Released: Friday, October 25, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20039D194 - Ack receipt of 810810,1117 & 1217 ltrs informing NRC of steps taken to correct nonconformance noted in QA Program Insp Rept 99900741/81-01. (1 page(s), 12/28/1981)
- ML20039D200 - Responds to NRC 811204 ltr re nonconformance noted in QA Program Insp Rept 99900741/81-01.Corrective actions: engineering change order issued re lug change,welds corrected & insp personnel trained in use of weld gages. (2 page(s), 12/17/1981)
- ML20039D205 - Ack receipt of 810810 & 1117 ltrs informing NRC of steps taken to correct nonconformance noted in QA Program Insp Rept 99900741/81-01. (2 page(s), 12/4/1981)
- ML20039D211 - Responds to NRC 810930 ltr re nonconformance noted in QA Program Insp Rept 99900741/81-01.Corrective actions:QA checklist revised,engineering change orders to be generated for future substitutions & weld fillet gages acquired. (7 page(s), 11/17/1981)
- ML20039D216 - Responds to NRC 810930 ltr re nonconformance noted in QA Program Insp Rept 99900741/81-01.Thirty-day extension of response time requested due to change in QA personnel. (1 page(s), 10/20/1981)
- ML20039D222 - Ack receipt of 810810 ltr informing NRC of steps taken to correct noncomformance noted in QA Program Insp Rept 99900741/81-01.Addl info specified should be provided within 25 days. (2 page(s), 9/30/1981)
- ML20039D236 - Responds to NRC 810610 ltr re nonconformance noted in QA Program Insp Rept 99900741/81-01.Corrective actions:QA checklist & manual revised.Criteria of 10CFR50 App B addressed in process specs of QA manual suppls. (4 page(s), 8/10/1981)
- ML20039D241 - Advises that application for 30-day extension of corrective action response is acceptable.New due date is 810810. (2 page(s), 7/10/1981)
- ML20039D250 - Requests 30-day extension on corrective action response. (1 page(s), 7/2/1981)