NRC Logo

Home > NRC Library > ADAMS Public Documents

Submits GE Edison 811210 memo summarizing 811109 meeting w/util re concrete imperfections in reactor bldg dome,per ASLB 811204 request at evidentiary hearing.

Accession Number: ML20039B032

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer